About NicC

The firm has worked with Central and State Government Organisations since its inception in 1986 as “A” class contractors and does acclaims for its prompt and proper execution of work every where.

Besides the work costing Rs. 100 Laces of Jawahar Navaodya Vidyalaya at Mandi (H.P). The Firm has handled highly challenging jobs like construction of Dam Foundation Tunnel, Shuttering and reinforcement work of Power Plant Building, Construction of Cable Tunnel, Construction of R.C.C. wall and toe walls at down stream portal of Tunnel’s at R.S.D. Project. Excavation of exploratory pit at Shahpurkandi barrage involving a total cost of rupees 945 Laces in stipulated time of 4 months to 18 months to the entire satisfaction of the authorities. The excavation of exploratory pit required digging in the river bed with the maximum seepage and sub soiled strata by operating day and night for days. Heavy dewatering has to be done with the help of pumps. The firm has executed number of works of Shahnehar Project under I&PH Department of HP including Cut & Cover portion of 4 Km Length including 500mtr Aqueduct on piers involving Excavation including rock cutting in a depth ranging 5 mtr to + 50 meter. The firm has also executed the Head Works of Siddhartha Medium Irrigation Project involving rock cutting, concreting 114 meter long bridge over Dehar Khad costing 600 Lacs. The firm has also worked in Railway Department. We have completed the work of Zone No. 12 from the Km 27.625 to 31.443 km in between Una and Churaru and the work of doubling the Railway Line Cholang to Pathankot in length of 78 km out of 112 km Jalandhar-Pathankot section amounting to Rs. 1500 Laces. The Firm has remarkably completed lots of road works under HP PWD, BR including high level bridge and nearly 550m long embankment at the height of 15m including dry pitching and bolder apron crates.

Fully equipped machinery is available with us and other sophisticated items are being pressed into services to complete the jobs in hand.

Our Brochure